Preventing reflective cracking and road surface deformation

Rhoose Airport Roundabout


Image

Client

Vale Of Glamorgan Council


Contractor

Tarmac Contracting


Location type

Rhoose Airport Roundabout


Completion

February 2017



The challenge

Cardiff Airport has undergone a huge transformation in recent years with improvements made to the terminal providing air travel for more than 1.3 million passengers each year. One of the main roundabouts used to access the Airport car park and main maintenance hangar is situated just North of the Airport linking the A4226 and B4265. Its location, on the main route to RAF St Athan and the Aberthaw Power Station and Cement works, makes it one of the most heavily trafficked roundabouts in South Wales. Surface course deformation and joint failure were common problems and previous patched repairs were also beginning to fail. The decision was made to resurface the entire roundabout and approach roads, (approx. 6700m²) however, budget restraints meant a full depth reconstruction was not a viable option.



Our solution

As the nominated contractor for carriageway maintenance within the Vale of Glamorgan, Tarmac were approached for early involvement in planning the scheme. They were asked to provide technical advice on a long term, cost effective surfacing solution that could be laid quickly to avoid disruption for road users. Following successful use elsewhere in the Vale of Glamorgan, an ULTILAYER 10 surface course was chosen as the most suitable material for this scheme. ULTILAYER combines a high performance polymer modified binder with selected aggregates to provide flexibility, strength and long term resistance to cracking and deformation.



Results and benefits

The client allowed works to be completed during normal working hours, with a partial road closure, but required that it was phased to minimise disruption to road users. The scheme was completed over six days and reopened on schedule. Around 650 tonnes of the existing surface course was planed out. Planings were sent to Tarmac’s Llanwern site to be recycled and used in future projects. After regulating and minor patching of the binder course, 750 tonnes of ULTILAYER 10 surface course was laid in a single 40mm layer. Early involvement from Tarmac helped the client to meet their objectives of delivering a durable long term surfacing solution for this busy road while minimising disruption to road users.


Learn More about ULTILAYER Download case study

Asphalt contact


case studies

  • ULTILAYER Durable road surface, A58 Clay Pit Lane
  • ULTILAYER Resurfacing a residential street over poor quality substrates
  • ULTILAYER Preventing reflective cracking and road surface deformation
  • ULTILAYER Fast, single layer resurfacing, Kingston Gyratory re-development
  • ULTILAYER Fast, single layer resurfacing, Stratford Gyratory re-development
  • ULTILAYER Durable resurfacing for concrete overlays,
  • ULTILAYER Durable resurfacing for residential roads
  • ULTILAYER WITH ULTILOW WARM MIX BINDER Fast, sustainable, single layer resurfacing on a busy London road
  • ULTILAYER Junction surface improvements in Cosham, Portsmouth
  • ULTILAYER, ULTILOW and Steel Slag ULTILAYER SMA delivers single layer pavement upgrade in Northolt 
  • ULTILAYER Preventing cracking and deformation on busy city road
  • ULTILAYER Time saving road upgrade to install sustainable cycle-way
  • ULTILAYER Durable asphalt for heavily trafficked city road in central London
  • ULTILAYER Time saving, cost effective asphalt for residential avenue
  • ULTILAYER Preventing repeating cracking on country road
  • ULTILAYER Long lasting asphalt for busy roundabout
  • ULTILAYER Long lasting texture on steep gradient