Mancetter Collect Asphalt Plant
Tarmac are collect asphalt specialists. Asphalt suppliers to Nuneaton, Hinckley, Tamworth, Wilnecote, Atherstone, Leicester and Coventry.
Tip off
Priority collection & quick turnaround
Hot Drinks
Improved sustainability
Welfare facilities
Perfect for local schemes
Quality assured
Onsite shop
Mancetter Asphalt Plant Quarry Lane, Mancetter, Atherstone, Warwickshire, CV9 2RF
OPENING HOURS
Mon - Fri 7am - 11am / 12.30pm - 2pm
Saturday 6am - 9am
Sunday On request
ASPHALT
ANCILLARY
WEEKEND ORDERS
For weekend orders please notify the plant in advance (where possible) to arrange and confirm your loading time. Call the plant to confirm.
OUT OF HOURS
We can service out of hours orders (evening & weekends). Minimum tonnages and opening fees apply. Call Sales for further details.
COLLECT ASPHALT
Mancetter Asphalt Plant
Quarry Lane,
Mancetter, Atherstone,
Warwickshire,
CV9 2RF
Asphalt products available to collect
Tarmac are industry leading asphalt suppliers. Our Asphalt2Go collect asphalt service offers a priority asphalt collection service from our large network of quality assured UK asphalt plants.
Drop in,
load up,
drive out
No fuss, no hassle
Simply drive into any of our collect asphalt plants across the UK and we’ll quickly fill up your vehicle with high quality asphalt. Whether you need a small or a large collection, we’ll complete your order swiftly and efficiently.
Across the UK
We can provide everything you need, from high quality asphalt to fast delivery readymixed concrete. We offer welfare facilities and a shop for all your accessories all onsite.
To order, call your local Asphalt2Go site.
Your safety is
our priority
At Tarmac we care about people, and constantly strive to improve our performance because nothing is more important than the safety and health of our customers. Naturally this extends to our busy Asphalt2Go plants.
- Report to the weighbridge before being loaded
- Use designated vehicle routes, parking areas and pedestrian walkways
- Comply with all safety instructions given to you by site staff
- Use designated sheeting area/bay to sheet and un-sheet your vehicle
- Switch off your engine and remove the ignition key when leaving your vehicle unattended
- Do not use your mobile phone when driving or walking around on site
- The safety equipment shown must be worn on Tarmac sites.
Care
Safety Helmet
Safety Glasses
Safety Footwear
Gloves
(for sheeting up)
Hi-Vis Clothing
Tarmac is committed to achieving a target of Zero Harm.
Surfacing
supplies shop
Available in our shop at Mancetter Asphalt Plant
Helpful spread guide
Use our guide of spread rates to help work out the right quantity for your job.
*Figures shown are based on limestone asphalts and macadams. This guide is designed to show sample spread rates and is intended as a guide only. Actual spread rates can vary depending on the aggregate used.
Average thickness of course (mm) | Open graded and single course macadam and porous asphalts* (M2/T) | Heavy duty, dense, modulus, close, medium and fine-graded macadams* (M2/T) |
20 | 20-27 | 18-24 |
25 | 17-22 | 15-19 |
30 | 14-17 | 13-15 |
35 | 12-16 | 11-13 |
40 | 12-15 | 10-12 |
45 | 10-13 | 9-11 |
50 | 9-12 | 8-10 |
60 | 8-10 | 7-8.5 |
65 | 7-10 | 6-7.5 |
75 | 7-8 | 5-6.5 |
100 | 4.5-6 | 4-5 |