TRUBED Cement Bound Sand
TRUBED is a correctly proportioned factory mixed stabilised cement bound sand. It is a semi dry cement bound sand mixture, typically supplied in a 14:1 ratio.
The Cement Bound Sand range (CBS) of Trubed, pre-blended, factory mixed semi-dry products has been specially developed for use in a wide range of building and civil engineering applications. Trubed CBS sand products are available nationwide and can be delivered in bulk tipper loads or in convenient bulk bags.
Please note: Tarmac Trubed CBS (with the exception of Trubed Eco) contains a retarding admixture in order to remain workable for up to 12 hours.
Tarmac TRUBED ECO is a factory mixed, semi-dry lime: sand mixture with a long shelf life meaning it can be stored and used over a longer period.
Tarmac TRUBED is a correctly proportioned factory mix semi-dry, cement sand mixture from 1:3 to 1:20 cement:sand by volume can be supplied. Tarmac TRUBED is workable for up to 12 hours.
Tarmac TRUBED UTILITY is a correctly proportioned factory mix semi-dry 1:14, cement sand mixture. Fully compliant sand and cement blend certified to ENA Technical Specification 97-1. TRUBED UTILITY is workable for up to 12 hours and is specified under National Grid Specification.
Where can cement bound sand be used?
Cable bedding projects – ENATS compliant
Cement bound sand can be used for ENATS compliant cable bedding projects.
Trench stabilisation projects
CBS Sand can be used for trench stabilisation projects.
Paving projects
Cement-bound sand is usable for paving prjects.
Small projects
Cement Bound Sand Sand can be used for projects of all sizes.
Masonry
CBS Sand can be used for masonry projects.
Groundworks and infill
Cement Bound Sand is suitable for groundworks and infill projects.
Why use cement bound sand?
Cement bound sand applications
TRUBED Cement Bound Sand may be used for a wide range of building, utility and civil engineering applications including the following:
- Bedding/protection of cables and pipes
- Filling of disused fuel tanks, sewers and other voids for safety reasons.
- Levelling or blinding of hardcore or sub-bases
- Bedding of paving slabs
- Covering of ducts
- General infill work
TRUBED Cement Bound Sand contact
Downloads
Download files individually or add multiple files to a zip folder.